From: route@monster.com
Sent: Friday, April 29, 2016 3:26 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
Katherine
A Lowe RCDD, RTPM, LEED® AP
757
204th Street Pasadena MD 21122 Cell#
443-610-2950 KathyAnnLowe@Gmail.com
SUMMARY: Experience
includes five years On-Site Project Construction Management, four years
Electrical /Telecom Designer, utilizing AutoCAD & Vector Works software,
eight years of Electronic Component Level Troubleshooting, two and a half
years with Contract Requirements for Logistical Support, three years Customer
Service/Order Management for the Federal Government shipping Conus, and
Oconus (Overseas). WORK HISTORY:
Absolute
Underground Inc March 2015 to August 2015 Project
Manager OSP/ISP for Commercial side of Comcast Region Baltimore City v
Site Surveys to
identified resources required, assig responsibilities and coordinated project
staff directly and indirectly to ensure successful completion of the project v
Communicated
extensively with clients, sub-contractors and vendors to establish
cordial/effective working relationship v
Managed multiple projects and
successfully achieved milestones, ensuring projects complied with all cost
and scope specifications. v
Trained project staff to operate and
maintain data entry and reports to provide forecast to Comcast sales team. Self
Employed August 2013 to November 2014 v
M & S Interiors –( LabCorp
renovations) Site Superintendent & demo crew, oversee on-site project
activity to ensure projects are completed safely on schedule, within budget,
and in accordance with engineering design. ( M&S Interiors - LabCorp
renovations) AVA Electric Co. June 2010 to August 2013
On-Site
Construction Manager / Superintendent for Maintenance Communication, Telecom
Infrastructure & Electrical Contract for Maryland Aviation
Administration, Baltimore/Washington International Thurgood Marshall Airport
(BWI) & Martin State Airport. v
Site Superintendent, QC & Safety
Manager, overseen all on-site project activity to ensure projects are
completed safely on schedule, within budget, and in accordance with
engineering design. v
Coordinate and communicate between
field, design disciplines and client. v
Obtain approvals and permits for new
projects. v
Approve sub-contractor and vendor
quotes and invoices. v
Ensure that construction plans are in
agreement with customers’ expectations and identify points at which
contractual obligations will have been met. v
Examine field conditions and identify
problems, inaccuracies and cost savings measures that arise or that may be
encountered. Take corrective actions as needed. v
Designed requirements for specific job
needs (ie, integration and implementation of voice and data structured
cabling systems in and around BWI airport. v
Preformed red-lines and reviewed Cadd
drawings before presenting to customer as final As-Built. Metro Systems (AVA Electric) June 2009 to March 2010
On-Site Project Manager
for Maryland Aviation Administration at BWI Thurgood Marshall Airport for the
Fiber Ring 1 Project. Installation of 192 strand SMFO cable in both new and
existing infrastructure in and around airfield and landside, including two
exterior pedestals and three communication rooms. v
Maintained 100% safety record
throughout contract. v
Maintained 100% environmental wetlands
protection requirements (erosion & sediment control). v
Took corrective action as needed during
project and/or consulted with construction project manager to resolve issue
arising during project. v
Assisted Parsons (Resident Engineers)
with on-site inspections of open trench and horizontal directional drilling
of approximately 15000’ of 4” bore guard type conduit. v
Maintained quality control by keeping
communication between all parties open and clear through out the course of
project. v
Increased revenue by keeping accurate
measurements of installed and performed pay line items during the
installation process not only for AVA but also for sub-contractors. Allen & Shariff Engineering Inc. November 2004 to January 2009
Electrical
/ Telecom Designer v
Design electrical systems to support
general Power, Lighting, HVAC, Fire Alarm and Information Technology Systems
(ITS). Coordinated ITS & power requirements with Owner, Architect,
Mechanical Engineer and Fire Protection Engineer. v
Design entry, entry backbone, and
horizontal cabling and pathways for commercial projects. v
Design telecom space rack and tray
layouts, termination layouts and grounding systems. v
Assisted design and drafting for senior
electrical engineer. v
Reviewed & Approved tenant fire
alarm designs for Siemens Fire Alarm Drawings. JJW Logistics Inc. March 2001 to November 2004
Account
Executive / Order Management Unisys U.S. Federal Government Group, November 1996 to March 2001
Order
Management / Customer Service for Volume Technology Practice (VTP) State Sales & Service, Electronic Power
& Control, and Daedalien Incorporated
March 1990 – November
1996
Electronic Technician / Assistant Manager EDUCATION:
National Training SystemsMarch 1988 - September 1989
Baltimore, MD 21202 Courses studied include: Electricity: Complex AC and DC circuit analysis, active
and passive component theory, filters, and magnetics. Electronics: Diode and transistor theory and operational
amplifiers, control circuitry, and power supplies. Digital
Electronics: Discrete logic gates,
numbering systems and computer math, flip-flops, counters and shift
registers, memories, and digital systems. Introduction
to Microprocessors: MC6800
architecture and Programming, mechanics, and digital review. CERTIFICATES: |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|